waste reduction

Using What You've Got: Recycling Renovation Waste

In October of last year we bought our first house in Edmonton--and we've been renovating ever since.  Sound familiar?

Our initial attraction to the property was it's three-fold potential:

•  Potential to make this old house (1942) into a energy-efficient family home (hopefully for many years to come);

•  Potential to make this huge double lot (8000+ square feet) into a more environmentally sensitive/edible landscape (we love growing our own food); and finally,

•  The potential (and challenge) of being good neighbors/citizens in an older and struggling North Edmonton community (Build better communities, stop urban-sprawl, "improve, don't move", etc.).

 

Idealistic? Yes, whatever...

One of the biggest challenges to renovations and landscaping we are constantly up against is cost. Not making a lot of money, the cost of creating a space we can enjoy without guilt has called for some genuine creative thinking... and I hope some of the ideas we've come up with will be of interest to readers who can relate.  read more... »

Waste Reduction

The construction of today’s modern house expends a lot of energy and creates a lot of waste. We’ve worked hard to reduce waste while building the Mill Creek NetZero Home.

Wood

Green Door Builders framed the home, and along with building us a very airtight double-walled system, they were extremely conscientious about keeping their waste to a minimum. Here is a picture of 100% of the OSB waste that they created:

IMG_0996

(a tiny pile of OSB waste, considering that a 2000+ sq. ft. home was framed with OSB sheathing)

Our LEED inspector was very impressed with this tiny pile.  read more... »

MCNZH - Progress (part 2) - more framing, wood reuse

We have trusses, and we'll have a roof by tomorrow. Nick and Adam of Green Door Builders are doing a great job of framing the house. Peter is always amazed at how little waste they create. They're only throwing out little toothpicks of plywood. On top of that they are dipping into a pile of reusable lumber that I set aside for them:

A 2x6 left behind by the cribbing crew (up top, covered with a light coating of concrete) was conscientiously reused during framing  read more... »

Recycling Gluelam Beams

The Mill Creek NetZero Home (MCNZH) will have very heavy floors. The concrete top coats applied to the main and second floors (in order to add thermal mass to the home) will each contain about 200 cubic feet of concrete. At about 145 pounds per cubic foot, we're talking 29,000 pounds, or over 13 metric tonnes of concrete, on each floor.  read more... »